2017 Street Reclamation Project
2017 Street Reclamation Projects

INTRODUCTION

The 2017 Street Reclamation Project includes:

Maple Street – Ninth Street – Nevada Street Area

  • Maple Street from Woodley Street to Ninth Street
  • Ninth Street from Maple Street to Nevada Street
  • Nevada Street from Ninth Street to Seventh Street
  • Hillside Court
  • Bunday Court

Professional Drive Area
  • Professional Drive from Woodley Street to TH 3 Frontage Road

Marvin Lane Area
  • Marvin Lane from Washington Street to Division Street

Sibley View Area
  • Sibley View Lane from Jefferson Parkway to Sibley View Court
  • Sibley View Court

The process will begin with the Northfield City Council ordering a Feasibility Study on December 6, 2016.  The Feasibility Study examines the proposed street and utility improvements along these street corridors to determine whether the project – as proposed – is feasible, cost effective and necessary.  The planned work along these sections is:

Maple Street – Ninth Street – Nevada Street Area – The entire area will receive a full depth reclaim (up to 12”), which means the asphalt will be ground up and mixed with the underlying gravel base to establish a new base for new asphalt.  This reclaimed material will then be reshaped and recompacted in order to receive 4” of new asphalt pavement.  Minor spot repairs on utilities and curb and gutter will be completed as necessary.  This area was also identified in the Safe Routes to School Plan (SRTS) for sidewalk installations on both sides of Maple Street, Ninth Street, and Nevada Street.

Professional Drive – Marvin Lane – Sibley View Areas - The entire area will receive a full depth reclaim (up to 12”), which means the asphalt will be ground up and mixed with the underlying gravel base to establish a new base for new asphalt.  This reclaimed material will then be reshaped and recompacted in order to receive 4” of new asphalt pavement.  Minor spot repairs on utilities and curb and gutter will be completed as necessary.  


PROJECT PROCESS

The process for developing the special assessments for properties along the project corridor follows Minnesota State Statue Chapter 429 - Local Improvements, Special Assessments. The Project Process steps are typically completed to take advantage of a positive bonding environment and to make full use of the construction season.


PROJECT MEETINGS AND UPDATES

12/6/16 (7:00-9:00 PM) - Order Preparation of Feasibility Report, City Hall Council Chambers, 801 Washington St. S.

12/14/16 (5:30-7:00 PM) - 1st Neighborhood Meeting, City Hall Council Chambers, 801 Washington St. S. Neighborhood Meeting Notice

MAPS/PLANS/FILES